ABB PVS-100-TL-B-SY2 Product Manual page 61

Table of Contents

Advertisement

• Remove handle or other lifting
device (if used)
• Only for vertical mounting:
Insert the two gasket protec-
tive covers (contained in the
installation kit) and slide them
till the positioning pins are into
the proper bracket holes. If the
mounting is correct the gasket
protective cover will have a
locked position.
• Lift the power module up to the
bracket and over the wiring box,
using the (optional) handles
or the (optional) M12 eyebolts, or
another appropriate lifting device.
Risk of injury due to
the heavy weight of
the equipment.
04
- 61 -
5 - Installation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents