ABB PVS-100-TL-B-SY2 Product Manual page 107

Table of Contents

Advertisement

7 - Operation
STEP 3 - Date, Time and Time zone
Set the Date, Time and Time zone (The inverter will propo-
se these fields when available).
When it's not possible for the inverter to detect the time
protocol, these fields have to be manually entered.
Click on "Next" button to proceed to the next stage of the
configuration wizard.
- 107 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents