ABB PVS-100-TL-B-SY2 Product Manual page 65

Table of Contents

Advertisement

CH1
CH3
CH5
CH2
CH6
CH4
Interface connectors connection
Last operation before proceed with the wiring and connections of AC and
DC sources is to connect the interface connectors that allow the power
and the communication connection between the power module
the wiring box
:
02
Connection of the AC interface cables:
• Connect the R, S, T cables coming from the wiring box to the respec-
tive anchor points R, S, T in the AC interconnection board
the screws supplied with the power module component kit (tightening
torque 4Nm).
• Connect the earth cable to the dedicated point next to the AC inter-
connection board
(see the picture) using the M5 nut and the two
58
serrated lock washers supplied with the power module component kit
(tightening torque 2Nm).
A
B
Connection of the DC interface cables:
• Connect the 6 connectors coming from the wiring box in the dedicated
connectors of the DC interconnection board
A
CH2
CH1
- 65 -
MP3
ZGN.V2Q33.1
MP7
MP6
Pb-free
R S
MP8
MP2
C1
MP9
MP1
T
C3
C2
MP4
MP5
59
CH4
CH6
CH3
CH5
5 - Installation
and
01
using
58
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents