Inverter Parameters > Active Power Control (Only visible
and editable with Admin Plus privileges)
In the Active Power Control sub-menu you can config settings related
to the active power derating parameters using the following parameters
groups:
1. Active Power Curtailment
2. CEI Average VGrid Derating
3. Volt/Watt settings: P(V)
Do not change these parameters if not requested by the grid operator.
Inverter Parameters > DC Settings
In the DC Settings sub-menu you can setup the parameter related to
the Input DC side:
1. VStart 1 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 1. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
2. VStart 2 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 2. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
3. VStart 3 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 3. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
4. VStart 4 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 4. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
5. VStart 5 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 5. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
6. VStart 6 New Value
This parameter is used to sets the Vstart activation voltage for the input
channel 6. This voltage imposes a minimum input voltage on the inverter
above which connection to the grid will be attempted.
Change the activation voltage only if really necessary and to set it to the correct value: the
photovoltaic generator sizing tool available on the ABB website will indicate whether Vstart
needs to be changed and what value have to be set.