ABB PVS-100-TL-B-SY2 Product Manual page 103

Table of Contents

Advertisement

COMMISSIONING PROCEDURE - WIRELESS CONNECTED
• Open an internet browser (recommended browser: Chrome ver-
sions from v.55, Firefox versions from v.50) and enter the pre-
set IP address 192.168.117.1 to access the Web User Interface.
Web User interface has easy commissioning wizard to commission the
inverter.
The language of the wizard could be changed by clicking on the upper status bar
The required informations during the procedure are:
STEP 1 - Administrator/User login credentials
- Set the Administrator account user and password
(minimum 8 character for password):
Administrator account can open and view the contents
of photovoltaic site. Additionally, they can make changes
to inverter settings.
User and password are CASE SENSITIVE.
- Set the User account user and (optional) password
(minimum 8 character for password):
User account can only read data. It cannot make any
changes.
User and password are CASE SENSITIVE.
- 103 -
7 - Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents