ABB PVS-100-TL-B-SY2 Product Manual page 161

Table of Contents

Advertisement

- Error code
- Error message
Name of Alarm and Cause
- LED status
Parameters of grid voltage outside range:
This error signal occurs when during the inverter's
normal operation the grid parameters exceed the
- W003
limits set by the operator:
- Grid Fail
- Grid voltage absent (after the signal the inverter
-
Yellow LED
goes to "Missing Grid")
- Unstable grid voltage (values too low or too high)
- Unstable grid frequency
Grid overvoltage:
- W004
This error signal occurs when during the inverter's
- Grid OV
normal operation the grid voltage exceeds the
-
Yellow LED
maximum limit set by the operator.
Grid undervoltage:
- W005
This error signal occurs when during the inverter's
- Grid UV
normal operation the grid voltage exceeds the
-
Yellow LED
minimum limit set by the operator.
Grid over-frequency:
- W006
This error signal occurs when during the inverter's
- Grid OF
normal operation the grid frequency exceeds the
-
Yellow LED
maximum limit set by the operator.
Grid under-frequency:
- W007
This error signal occurs when during the inverter's
- Grid UF
normal operation the grid frequency exceeds the
-
Yellow LED
minimum limit set by the operator.
Low "Bulk" voltage (DC-DC circuit):
The alarm (which is a warning and not an error)
- W011
is generated when the voltage at the heads of the
- Bulk UV
bulk capacitors does not reach the threshold for
-
Yellow LED
the operation of the inverter (internal unchangeable
threshold).
- W012
Battery Low:
- Batt. Low
The inverter has detected a backup battery voltage
-
Flashing yellow
that is too low.
LED
Solution
• Check the grid voltage on the inverter.
- Should it be absent, check for absence of grid voltage on the
supply point.
- If, on the other hand, the voltage tends to rise (when the
inverter is connected) there is high line or grid impedance.
• Check the grid voltage also on the supply.
- If it is high, it means that there is high grid impedance. In
this case, ask the operator to adjust the grid voltage. If the
operator authorises a change to the inverter's parameters,
agree the new limits with customer assistance
- If the voltage at the point of supply is much lower than that
measured on the inverter, it is necessary to adjust the line
(inverter-contactor).
- If the voltage and the grid frequency come back within the
limits (also when the inverter is connected to the grid), contact
customer assistance
• Check the grid voltage on the inverter.
If the voltage tends to rise (when the inverter is connected),
there is a problem of high line or grid impedance.
• Check the grid voltage also on the supply.
- If it is high, it means that there is high grid impedance. In
this case, ask the operator to adjust the grid voltage. If the
operator authorises a change to the inverter's parameters,
agree the new limits with customer assistance
- If the voltage at the point of supply is much lower than that
measured on the inverter, it is necessary to adjust the line
(inverter-contactor).
- If the voltage and the grid frequency come back within the
limits (also when the inverter is connected to the grid), contact
customer assistance
• Check the grid voltage on the inverter.
• Check the grid voltage also on the supply.
- If it is high, it means that there is high grid impedance. In
this case, ask the operator to adjust the grid voltage. If the
operator authorises a change to the inverter's parameters,
agree the new limits with customer assistance
- If the voltage at the point of supply is much lower than that
measured on the inverter, it is necessary to adjust the line
(inverter-contactor).
- If the voltage and the grid frequency come back within the
limits (also when the inverter is connected to the grid), contact
customer assistance
• Check the grid frequency in the inverter.
• Check the grid frequency also on the supply:
- If the voltage and the grid frequency come back within the
limits (also when the inverter is connected to the grid), contact
customer assistance
• Check the grid frequency in the inverter.
• Check the grid frequency also on the supply:
- If the voltage and the grid frequency come back within the
limits (also when the inverter is connected to the grid), contact
customer assistance
• Raise the value of the activation voltage (Vstart) so as to
have sufficient power from the PV generator at the time of the
inverter's grid connection.
• Check the input voltage on the inverter.
- If it does not exceed Vstart, check for the presence of
sufficient irradiation and the correct composition of the system.
- If it exceeds Vstart, contact customer assistance.
• Check that the date/time are set correctly and, if they are not,
set them.
Subsequently arrange to completely switch off the inverter (on
both AC and DC) and wait a few minutes.
Finally, restart the inverter and check whether the date/
time are now correctly set or whether they have reset to
01/01/2000. In this case replace the battery with the inverter
completely switched off (isolate AC and DC side) being careful
to maintain the polarity.
- 161 -
8 - Maintenance

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents