Promise Technology VTrak M610i Product Manual page 279

Hide thumbs Also See for VTrak M610i:
Table of Contents

Advertisement

Reported Event
Migration has detected/
cleared stale NV
Watermark
Array was incomplete due
to missing NV Watermark
Rebuild
Rebuild is started
Rebuild is completed
Rebuild is paused
Rebuild is resumed
Rebuild is stopped
Rebuild stopped internally The logical drive is offline. See page 269.
Rebuild is aborted due to
an internal error.
Rebuild is queued
Rebuild marks logical
drive synchronized upon
rebuild completion
Redundancy Check
Redundancy Check is
started
Redundancy Check is
completed
Redundancy Check is
paused
Redundancy Check is
resumed
Watermarks are progress markers left as the result of
interrupted RAID migrations. If the watermark was
cleared, migration should finish.
RAID migration was interrupted by a shutdown.
If array is online, try migration again. See page 113.
If array is offline, delete and recreate array. See
page 109 and page 105.
Result of settings or user action. Normal.
Normal.
Rebuild paused because of user intervention,
schedule or a higher priority background activity.
Rebuild has resumed again after a pause.
Rebuild stopped because of user intervention,
schedule or the logical drive was deleted or the target
disk drive encountered an error. If rebuild stopped by
user intervention, restart the rebuild. See page 114.
System resources are low. Reduce system load or
restart the VTrak. See page 90.
Rebuild has been set manually or by schedule.
Result of successful rebuild. Normal.
Redundancy Check has started manually or by
schedule.
Redundancy Check has finished.
Redundancy Check paused because of user
intervention, schedule or a higher priority background
activity.
Redundancy Check has resumed again after a
pause.
265
Chapter 8: Troubleshooting
Corrective Action

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtrak m310iVtrak m210i

Table of Contents