Connecting The Plc For Ltp/Ltpv Operation - Novexx Solutions 64 Series Technical Manual

Hide thumbs Also See for 64 Series:
Table of Contents

Advertisement

08/10 Rev. 5.05-01
Connecting the PLC for LTP/
LTPV operation
Also refer to section
64-xx
on page 10.
The cable harness fitted earlier consists of
three cables, labeled VENT, SENS and
MOTOR. Two connectors on the PLC
board are also labeled VENT and SENS
(see figs. 1 and 2).
1. Connect the VENT (4) and SENS (5)
cables, which are part of the cable har-
ness, to the sockets on the PLC board that
bear the same names (fig. 2).
Don´t plug in the cable labeled MOTOR!
The plugs (1) and (2) are located on two of
the cables that are already plugged into the
PLC board (fig. 3).
2. Connect plugs (1) and (2) to the USI board
(fig. 4).
Plug the plug (1) exactly into the position
shown!
When plugging in plug (2), pay attention to
the information on the cable sleeve!
3. Reassemble the housing parts.
TECHNICAL MANUAL
Connection Diagram
64-xx
1
2
3
4
7
Mounting the PLC

Advertisement

Table of Contents
loading

Table of Contents