Honeywell CGW-MB Installation And User Manual page 10

Som module
Table of Contents

Advertisement

Revision History
Date
August 13, 2020
October 20, 2020
January 07, 2021
Rev. C
February 15, 2021
Rev. D
March 08, 2021
Rev. E
April 30, 2021
August 15, 2021
CGW-MB Installation and Users' Manual | P/N:LS10248-000HW-E | REV.G | JUL/31/2022
Table 1.2: Dates and Changes (Continued)
Added the Honeywell Alarm Transmission Service section.
• Added the CLSS Gateway mainboard to panel connection
procedures in Appendix C.
The panels are: ESSER, Gent, Morley IAS, NOTIFER UL, and
NOTIFIER EN.
• Updated for the NYC Fire Department certification.
Added the Fire-Lite panel connection procedure in Appendix C.
Added the brand selection feature details
Revision changed for the release process.
• Added the Modbus connection details
• Added the connection procedures for the following:
– AM Series Panels
– VESDA® Detectors
– INSPIRE Panels
– Fire-Lite® Panels
– FireWarden Panels
• 1.1 About This Manual: Added the Usages section
• 1.6 Approvals: The UL details brought at the beginning
• 1.6 Approvals: The FCC icon added in the FCC statement
• Figure 2.1: The OC Code label added
• Table 2.1: Label Name column and the OC code details added
• 2.5 Security Recommendations: Added this section
• Figure 3.4: Eth1 and Eth0 identified
• 4.4 Honeywell CLSS Alarm Transmission Services: Updated for NOC
• Appendix C: Removed the Fire-Lite connection procedure
• Appendix C: Updated the FireWarden connection section with
firmware details and additional notes
• Figure C.2: Eth1 and Eth0 identified
• C.5 FireWarden Panels: Minimum required versions details updated
• C.11 VESDA® Detectors: Minimum required versions details
updated
Change Details
General Information
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents