Figure 26: Gs970Emx/10 Switch Wall Installations With Four Brkt-J23 Brackets; Figure 27: Invalid Wall Installation With Front Panel Facing Down - Allied Telesis GS970EMX/10 Installation Manual

Gigabit layer 3 ethernet switch
Hide thumbs Also See for GS970EMX/10:
Table of Contents

Advertisement

GS970EMX/10 Gigabit Ethernet Switch Installation Guide
Figure 26 shows the switch with four brackets.
Figure 26. GS970EMX/10 Switch Wall Installations with Four BRKT-J23
Brackets
Do not install the switch with the front panel facing down. Refer to
Figure 27.
Figure 27. Invalid Wall Installation with Front Panel Facing Down
61

Advertisement

Table of Contents
loading

Table of Contents