Chapter 5: Verifying the Switch
72
Note
The illustration shows a North American power cord. Your power
cord may be different.
5. Wait two minutes for the switch to initialize the management software.
6. To verify hardware operations, begin with "Starting a Local
Management Session" on page 73. Otherwise, go to Chapter 6,
"Cabling the Networking Ports" on page 77.