Allied Telesis GS970EMX/10 Installation Manual page 9

Gigabit layer 3 ethernet switch
Hide thumbs Also See for GS970EMX/10:
Table of Contents

Advertisement

Figures
Figure 1: Front Panel ............................................................................................................................................................18
Figure 2: Back Panel ............................................................................................................................................................18
Figure 3: Link/Activity and Duplex Mode LEDs for the 10/100/1000Mbps Copper Ports .....................................................26
Figure 4: Link/Activity LEDs on the 1/2.5/5/10Gbps Copper Port.........................................................................................27
Figure 5: Link/Activity LED for the 1/10Gbps SFP+ Port ......................................................................................................28
Figure 6: Switch ID LED .......................................................................................................................................................31
Figure 7: Switch ID LED With Low Power Mode Disabled ...................................................................................................31
Figure 8: Switch ID LED With Low Power Mode Enabled ....................................................................................................32
Figure 9: GS970EMX/10 Switch Accessory Items................................................................................................................44
Figure 10: Installation Options for the GS970EMX/10 Switch ..............................................................................................45
Figure 11: Switch Installation on a Table..............................................................................................................................46
Figure 12: Unsupported Table Installations ..........................................................................................................................46
Figure 13: Attaching the Bumper Feet..................................................................................................................................47
Figure 15: GS970EMX/10 Switch with RKMT-J05 Cable Trays ...........................................................................................51
Figure 16: Items in the RKMT-J05 Equipment Rack Brackets Kit ........................................................................................52
Figure 17: Placing the GS970EMX/10 Switch Upside Down on a Table..............................................................................53
Figure 18: Removing the Feet from the GS970EMX/10 Switch ...........................................................................................54
Figure 19: Attaching the RKMT-J05 Handles to the Short Brackets.....................................................................................54
Figure 20: Attaching the Short RKMT-J05 Brackets to the Long Brackets...........................................................................55
Figure 21: Attaching the RKMT-J05 Cord Trays to the Long Brackets.................................................................................56
Figure 22: Attaching the RKMT-J05 Brackets to the Switch.................................................................................................57
Figure 23: Attaching the GS970EMX/10 Switch to an Equipment Rack...............................................................................58
Figure 24: BRKT-J23 Bracket Kit..........................................................................................................................................60
Figure 25: GS970EMX/10 Switch Wall Installations with Two BRKT-J23 Brackets .............................................................60
Figure 26: GS970EMX/10 Switch Wall Installations with Four BRKT-J23 Brackets.............................................................61
Figure 27: Invalid Wall Installation with Front Panel Facing Down .......................................................................................61
Figure 28: Marking the Screw Holes for Two BRKT-J23 Brackets .......................................................................................65
Figure 29: Marking the Screw Holes for Four BRKT-J23 Brackets ......................................................................................65
Figure 30: Attaching the Bottom BRKT-J23 Brackets to the Wall.........................................................................................66
Figure 31: Sliding the Switch into the BRKT-J23 Brackets...................................................................................................67
Figure 32: Attaching the Top BRKT-J23 Brackets to the Wall..............................................................................................68
Figure 33: Installing the Power Cord Retaining Clip .............................................................................................................70
Figure 34: Connecting the AC Power Cord ..........................................................................................................................71
Figure 35: Lowering the Power Cord Retaining Clip.............................................................................................................71
Figure 36: Connecting the Power Cord to an AC Power Source..........................................................................................71
Figure 37: Management Cable Included with Switch............................................................................................................73
Figure 38: VT-Kit3 Management Cable ................................................................................................................................73
Figure 39: Management Workstation, VT-Kit3 Management Cable, and Switch..................................................................74
Figure 40: Connecting the Management Cable to the Console Port ....................................................................................74
Figure 41: User Exec Mode Prompt .....................................................................................................................................75
Figure 42: Verifying the Switch ID LED ................................................................................................................................76
Figure 43: Installing an SFP+ Transceiver ...........................................................................................................................80
Figure 44: Removing the Dust Cover from an SFP+ Transceiver ........................................................................................81
Figure 45: Positioning the SFP+ Handle in the Upright Position ..........................................................................................81
Figure 46: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver .......................................................................82
Figure 47: Installing an SP10TW Cable................................................................................................................................83
Figure 48: GS970EMX/10 Switch Dimensions .....................................................................................................................90
Figure 49: Pin Layout for the RJ-45 Copper Ports (Front View) ...........................................................................................96
9

Advertisement

Table of Contents
loading

Table of Contents