8.5A
One of the L02G pro les has been shipped with L08A and L08B pro les installed as shown below.
8.6A
Using a small step ladder inside the greenhouse, carefully slide pro le L02G with L08A and L08B
connected into back connector S12 at a slight angle. Gently push center gable slightly towards the
front to slide other end of pro le into connector S21. Make sure both connectors snap securely into
place. Note L02G pro le rests on top of connector S22.
IMPORTANT: Make sure pro les L02G with L08A and L08B are in correct positions before installing. Arrange pro le
L02G so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside.
S12
8.6B
Slide pro le L02G at a slight angle into center gable connector S21. Gently push front side slightly
forward to slide other end of pro le into connecor S18. Make sure both connectors click securely into
place. Note pro le L02G rests on top of connector S22.
!
There is only one way to properly fasten connectors into pro les. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
pro le. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com
L02G
IMPORTANT: Arrange pro le L02G so rectangular holes in channels face
the LEFT when looking at the front of the greenhouse from the outside.
L08A
L08B
Pro le
L02G
S22
Connectors S12 and S21 CLICK into place.
S21
Connectors S21 and S18 CLICK into place.
40 of 55
Pro le
QTY
#L02G
1
L08B
L02G
S18
S22
Pro le
QTY
1
#L08A
1
#L08B
S21
QTY
#L02G
1
Need help?