Place door pro les L13D, L13F, L13G and L13H next to connectors S28 around
2.8B
Y26 panels as shown. Slide connectors into pro les. Make sure panels and pro le
L05F t into V-channels of each pro le.
L13G
S28
L13H
2.8C
Secure connectors with eight S02 screws.
Slide hex nuts and
2.8D
bolts into U-cutout in side of pro les
L13F and L13H. Tighten securely to hold in place.
2.9A
Place S40 locks on pro les L13D and L13G as shown.
Center the levers so the screw holes are visible.
S40
L13G
L13H
S40
S40
L13G
IMPORTANT: Install door locks so levers face the panels.
Pro le
#L13F
www.stcny.com
S28
L13G
L13H
L13F
L13D
Pro le
QTY
#L13D
1
#L13G
#L13H
L13F
L05F
L13F
NOTE: ALL VIEWS ARE FROM INSIDE.
2.9B
S40
L13D
Lock
QTY
1
#S40
1
#S40A
1
18 of 55
S28
L13D
S28
Secure each S40 lock with two S40A screws.
S40A
S40A
L13G
Move lever to the right side to
2.9C
place lock in the unlocked
position.
L13G
NOTE: Door locks are shown in the UNLOCKED
positition. When door is installed in step 15 and door
is closed, move lever to the left side to lock door.
Screw
QTY
2
#S02
4
S28
S02
L13D
L13D
L13D
Connector
QTY
QTY
#S28
4
8
Need help?
Do you have a question about the Easy2Build Easy-Grow 8' x 8' and is the answer not in the manual?
Questions and answers