8. IMMI module programming
8.2.1. Program structure nodes
You can configure the step sets in each node by using the checkboxes to enable/disable individual
steps.
• Startup Check: Intended for use once at the beginning of a robot program, this node ensures
the robot and machine are set up correctly before molding starts.
• Wait for Item: Intended for making the robot wait until an item is ready from the IMM.
Installation Guide
e-Series Injection Molding Machine
19
Interface (IMMI)
Need help?
Do you have a question about the e Series and is the answer not in the manual?