Tools Required; People Required - BWT COVERDECK AX-IN Installation And Maintenance Instructions Manual

Submerged automatic covers
Table of Contents

Advertisement

2.1.

Tools required

Step
Assembling the axle
Mounting the motor and the
control panel
Assembling the pit wall
Assembling the beam and
brackets
2.2.

People required

Assembling the cover axle
Setting up the motor
Installing the pit wall
Assembling the slat cover apron
Mounting the beam or brackets
The lengths of time quoted do not take the time required to fill the pool into consideration, this will depend on
the flow rate of the water supply and the volume of the pool.
PROTECTION & SAFETY
Spirit level
Set of wrenches
Mallet
Spanners
Concrete drill bit Ø10 mm
Disk grinder with diamond disk
Flat chisel and hammer
Small flat head screw driver
Cross-head screw driver
Stripping pliers
Cutting pliers
Stanley knife
Percussion drill and Ø 8 mm concrete drill bit
Rivet pliers
Mallet
Percussion drill
Measuring tape
Drill, 5 mm
Concrete drill bit, 13 mm
Allen key, no. 5
Cross-head screw driver, no. 2
Wrenches
Allen keys
Wood cutting tools (wooden duckboarding)
Step
Tools required
Number of people
2
1
2
2
2
8
Length of time
1 hour
0.5 hour
1 hour
1 hour
0.1 hour
2020/11 - Version: B - Code : 34561

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COVERDECK AX-IN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents