Power Supply; Commissioning; Setting Up Profinet Communication - Festo CPX-FB33 Operating Instructions Manual

Hide thumbs Also See for CPX-FB33:
Table of Contents

Advertisement

Commissioning

Connection
CPX-FB33/43:
Network connection with M12 plug
CPX-M-FB34/44:
Network connection with RJ45 plug
CPX-M-FB35/45:
Network connection with SCRJ plug
Service interface
Tab. 13: Examples of the connection technology and cover caps for degree of protection IP65/IP67
6.4

Power supply

Bus nodes are supplied with power via the interlinking blocks.
If there are problems with the power supply è 9 Diagnostics.
7
Commissioning
7.1

Setting up PROFINET communication

NOTICE
Malfunction due to incorrect switch-on sequence.
• First switch on the operating voltage supply of all network stations and then the operating power
supply of the open-loop control.
CPX- M-FB34: cyclical process data exchange can freeze in exceptional cases in applications with
increased electrostatic load.
This results in an entry in the diagnostic memory with error number FN150.
• Restart to ensure normal operation.
• Reduce electrostatic charges in the vicinity of the product or use a CPX Terminal with metal inter-
linking.
1. Define the operating mode and diagnostic mode with the DIL switches of the bus node.
2. Set up the automation project for the higher-order controller using suitable software.
3. Import the device description file into the software è www.festo.com/sp.
4. Configure the CPX Terminal in the software:
– System structure
– Network addressing
– Address allocation of the modules
5. Transfer the automation project to the higher-order controller.
Festo — CPX(-M)-FB33/34/35/43/44/45 — 2022-05f
Connecting hardware
Plug: NECU-M-S-D12G4-C2-ET
Plug: FBD-RJ45-PP-GS
Plug: FBD-SCRJ-PP-GS
Connecting cable: KV-M12-M12-...
Cover cap
ISK-M12
CPX-M-AK-C
ISK-M12
15