Download to protection system

IEC18000291 V1 EN-US
Figure 5:
Before downloading proceeds, the tool compares and displays the versions of the new database with the
one in the protection system. You may also enter an index and a comment beforehand in menu Tools/
Version (see
After the downloading procedure is complete, the protection system restarts. The valid version can then
be verified on the HMI.
The progress of the downloading procedure is shown on the screen in window Download to protection
system see
procedure to be presented correctly. The procedure can be interrupted by the user as far as Archive
data in the protection system.
16
Download to protection system and comparison of versions
Section
4.9.1). Data will only be saved if they are different or the version index is different.
Data can be correctly downloaded as soon as the user has been logged-in to the target
device.
Figure
6. The correct time format must be set via the control panel on the PC for the
© 2020 - 2022 Hitachi Energy. All rights reserved
1MRK 500 132-UUS Rev. B
GUID-0605665D-8046-4405-9B1E-A337AA64F876 v2
12000075-IEC18000291-1-en.vsdx
Distributed busbar protection REB500
Operation manual

Advertisement

Table of Contents
loading

Table of Contents