11.3 Records
Machine operators confirm by their signature
that they have received, read and
understood the Operating Manual and
Maintenance Instructions. The plant operator
agrees to follow anything set out herein
carefully. The machine operators who have
been instructed and are authorised to
operate the machine must be recorded in the
following table fig. 101 (page 88).
The acceptance of the machine must also be
documented. For this use the form sheet Fig.
Fig. 103 (page 89)
Each machine operator properly records all
maintenance and overhaul work carried out
and has the work confirmed by the person in
charge. Always fill in each maintenance in
form sheet fig. Fig. 104 (page 90)
This list ‐ properly completed and signed ‐
must be presented to the control bodies of
the mutual indemnity association or the
technical control board on demand.
Maintain an uninterrupted record!
All sheets may be copied. Keep the forms
sheets in the switchgear box together with
the operating manual.
04/2015 S. 87
Need help?
Do you have a question about the CONTI COMPACT CC-20 V and is the answer not in the manual?