Box Assembly Installation - Peco 06742408 Operator's Manual

John deere 1570 terrain cut 2015-newer 60” & 72” decks
Table of Contents

Advertisement

Box Assembly Installation

Note: It is recommended that two people assist you in the installation of the Box Assembly (Item #1).
Lift the Box Assembly (Item #1) and position the frame by aligning the Box Assy Pivot Brackets with the Pivot Bushing
of the Box Support Frame Assembly (Item #2). See Figure A.
Secure the Box by inserting (2) Clevis Pins (Item #3) from the outside of the Box Assy and fastening with (2) 5/8" Flat
Washers (Item #4) and (2) Hair Pin Clips (Item #5). See Figure A.
Figure A
Position and insert the Linkage Pin of the Box Support Frame Assy (Item #2) to the Adjusting Screw of the Box Assy
(Item #1), the Adjusting Screw may need to be adjusted to properly fit the Linkage Pin.
Secure the Adjusting Screw by using (1) Rue Ring Cotter Pin (Item #6). Repeat the procedure on the opposite side.
See Figure B below.
Figure B
Right Side View
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

0674240906742410

Table of Contents