Peco 06742408 Operator's Manual

Peco 06742408 Operator's Manual

John deere 1570 terrain cut 2015-newer 60” & 72” decks

Advertisement

Quick Links

P P P P P P
P P
P
P P
PECO
PECO
PECO
PECO
PECO
John Deere
1570 Terrain Cut
MANUAL PART#: Q0498
ENGINE DRIVEN - GRASS
R
R R
COLLECTION SYSTEM
Model# 06742408, 06742409 & 06742410
OPERATOR'S MANUAL
ASSEMBLY OPERATION MAINTENANCE
MODEL YEAR:
2015-NEWER
60" & 72" DECKS
Rev. 3 - Jan 2021

Advertisement

Table of Contents
loading

Summary of Contents for Peco 06742408

  • Page 1 P P P P P P ENGINE DRIVEN - GRASS PECO PECO PECO PECO PECO COLLECTION SYSTEM Model# 06742408, 06742409 & 06742410 MODEL YEAR: John Deere 2015-NEWER 1570 Terrain Cut 60” & 72” DECKS OPERATOR’S MANUAL ASSEMBLY OPERATION MAINTENANCE MANUAL PART#: Q0498...
  • Page 2: Table Of Contents

    GRASS COLLECTION SYSTEM TABLE OF CONTENTS SECTION PAGE SECTION PAGE Safety - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Length of Hose Adjustment - - - - - - - - - - - - - - - - - 20 Safety Alert Symbols - - - - - - - - - - - - - - - - - - - - - 3 Upper Hose Installation - - - - - - - - - - - - - - - - - - - - 20...
  • Page 3: Safety Alert Symbols

    SAFETY WARNING! NEVER operate the mower unless the discharge guard and either the deflector assembly or the vacuum collector adapter are fastened securely in place. WARNING! Do not work around the mower deck boot or the blower area until you are certain that the mower blades and the blower impeller have stopped rotating.
  • Page 4: Warranty

    6. REMEDIED EXCLUSIVE: The only remedies the purchaser has in connection with the breach or performance of any warranty on New PECO, Inc. consumer products are set forth above. In no event will New PECO, Inc. be liable for special incidental or consequential damages.
  • Page 5: Introduction And Description

    Section I - INTRODUCTION AND DESCRIPTION Introduction Description We are pleased to have you as a PECO customer. Your The collection system is designed for turf maintenance collection system has been designed to give you a low where there is a need to collect the grass clippings as maintenance, simple, and effective way to collect the the mower cuts the turf.
  • Page 6: Installation For Use

    Section II - INSTALLATION FOR USE Preparation Of Mower Carefully dismantle wooden shipping crate from around the components. Cut retaining straps and separate the parts. The collection system will have various parts located inside. Remove and sort all parts for easy identification. NOTE: Before each step of assembly it will help to study the exploded drawings.
  • Page 7: Rear Main Frame Installation

    Rear Main Frame Installation (Cont.) Secure the Main Frame Channel to the rear bumper by using (4) 7/16”-14 x 1” HHCS P#(K1458) and (4) 7/16”-14 Flange Nuts P#(K1459). See Figure C. Note: Some parts and part features have been hidden from view for visual clarity. Figure C Main Frame Channel (4) 7/16”-14 x 1”...
  • Page 8 Frame Support Brace Installation Position the Frame Support Brace P#(B0212) onto the rear side of the mower’s ROPS and raise the Frame Support Brace into position with the pins on the Box Support Frame. Position the ROPS so that they are sitting between the (2) mount holes as shown in Figure B.
  • Page 9: Box Support Frame Assembly

    Box Support Frame Assembly First, prepare the Frame Brace / Box Support Frame (Item #1) by installing (2) 5/8”-11 x 7-1/2” HHCS (Item #2), (2) 5/8”-11 Hex Nut (Item #3) and (2) 5/8”-11 Flange Nuts (Item #4). Thread the 5/8”-11 x 7-1/2” HHCS into the Hex Nut then secure the bolt to the Frame Brace by using the Flange Nut as shown in Figure A.
  • Page 10: Box Support Frame Assembly Installation

    Box Support Frame Assembly (Cont.) Finally, install the assembled Lt. Tube Assy (Item #1) to the left side of the Frame Brace (Item #2) by using (2) 3/8”-16 U-Bolts (Item #4) and (4) 3/8”-16 Ny-Flange Lock Nuts (Item #5). Be sure the Tube Edge is flushed against the Frame Brace Edge as shown in Figure C below.
  • Page 11: Frame Support Brace Installation

    Box Support Frame Assembly Installation Note: It is recommended that someone assist you in the installation of the Box Support Frame Assy (Item #1). First, align the lower bolt hole of the Left or Right Leg of the Box Support Frame Assembly (Item #1) to the bolt hole of the Frame Side (Item #2).
  • Page 12: Box Assembly Installation

    Box Assembly Installation Note: It is recommended that two people assist you in the installation of the Box Assembly (Item #1). Lift the Box Assembly (Item #1) and position the frame by aligning the Box Assy Pivot Brackets with the Pivot Bushing of the Box Support Frame Assembly (Item #2).
  • Page 13: Box Handle Assembly & Installation

    Box Handle Assembly & Installation The Box Handle is made up of two components, the Base Handle (Item #1) and Handle Extension (Item #2), secured together by a Shaft Coupling (Item #3). See Figure A. To install the Handle Extension onto the Base Handle, first, secure the Shaft Coupling onto the Base Handle. The Shaft Coupling has (2) sets of set screws, position the Shaft Coupling so that (1) set screw will tighten onto the Base Handle and secure the set screw, refer to Figure B.
  • Page 14: Dump Mechanism Adjustment

    Dump Mechanism Adjustment The linkage rods may be adjusted at the adjusting screw and at the latch assembly. To change the door closure tightness, thread the adjusting screw clockwise to loosen the contact between the door and the box, or counter- clockwise to tighten the contact between the door and the box.
  • Page 15: Engine/Blower/Blade Installation

    Engine/Blower/Blade Assembly Installation Before mounting the Engine/Blower/Blade Assembly (Item #1) onto the Engine Mount Assembly (Item #2), place (2) Rubber Shock Absorbers (Item #3) between the Mount Plate and Base of the Engine. Align the bolt holes of the rubber pads with the bolt holes of the Engine Mount Plate. See Figure A & Figure B. Place the Engine/Blower/Blade Assembly (Item #1) onto the Engine Mount Assy (Item #2) and align there bolt holes.
  • Page 16: Inlet, Inlet Ring & Debris Deflector Installation

    Inlet, Inlet Ring & Debris Deflector Installation Open box door. From inside box, slide Inlet (Item #4) halfway into inlet hole of the Right Box Side (Item #1), see Figure A. Take each half of the Inlet Ring (Item #2) and attach around matching groove in Inlet (Item #4). Slide Inlet (Item #4) &...
  • Page 17: Wiring Kit Assembly Installation

    Wiring Kit Assembly Installation To connect the Wiring Kit P#(A2152), connect the 4 gage Red Wire P#(P0620) to the positive (+) terminal of the starter solenoid on the engine. Route the Red Wire from the solenoid to the positive (+) terminal of the battery. Connect the 4 gage Black Wire P#(P0621) to one of the mounting bolt holes located on the bottom of the engine.
  • Page 18 Wiring Kit Assembly Installation (Cont.)
  • Page 19: Blower Cone Installation

    Blower Cone Installation Thread (1) 5/16”-18 Jam Nut P#(K0120) onto each end of (2) 5/16”-18 x 2-1/2” HHCS P#(K0125), refer to Figure A. Next, partially thread (1) bolt into each of the two threaded bosses located on the Blower Housing. Position the Blower Cone so the tabs line up with the bolts and tighten completely, refer to Figure B.
  • Page 20: Length Of Hose Adjustment

    Length Of Hose Adjustment Lower Hose To Blower Cone Installation The hoses in the following steps must be cut to fit your Slide a Hose Clamp, P#(J0090) over both ends of the 9”, machine. Do not cut the hoses until you have tried to fit Lower Hose.
  • Page 21: Impeller Blade Removal/Replacement

    Impeller Blade Removal/Replacement To Remove: First remove the 7/16”-20 x 1” HHCS P#(K1394) (#1), 7/16” Double Indented Washer P#(K0278) (#2) and (2) 3/8” x 15/16” Bushing P#(S0159) (#4) from the Taper-Lock Bushing P#(S4302) (#5). Next remove the (2) 1/4”- 20 x 1” HHCS (#3) and place them into the threaded holes of the Taper-Lock Bushing (#5). Gradually thread each bolt evenly into the Taper-Lock Bushing, forcing the blade to break-away from the Taper-Lock Bushing.
  • Page 22: Exploded Views

    A2046_01 - Pro 24 Box Assembly Bottom Explode...
  • Page 23 A2046_01 - Pro 24 Box Assembly Bottom Exploded Parts List...
  • Page 24 A2046_01 - Pro 24 Box Assembly Back, Sides & Top Explode...
  • Page 25 A2046_01 - Pro 24 Box Assembly Door & Door Frame Explode...
  • Page 29: Safety Decals

    SAFETY DECALS To promote safe operation, New PECO, Inc. supplies safety decals on all products manufactured. Damage can occur to safety decals either through shipment, use or reconditioning. Contact your local Service Center for replacement decals. P P P PECO...
  • Page 30: Operating Instructions

    * Remember that horsepower requirements will vary with been torn or worn through, replace with genuine the mowing conditions such as type and height of turf PECO parts. grass, moisture content, amount of leaves, whether the terrain is flat or hilly, etc.
  • Page 31: Lubrication

    Parts And Service Information container, and off of safety decals. Replace any missing or illegible decals. PECO collection system owners should record the name 2. Clean all debris from the box screen. and telephone number of their Service Center. Your Service Center will be happy to supply replacement 3.
  • Page 33: Troubleshooting

    Troubleshooting 2017 (v1.0) Collection System Performance Problem Possible Cause Corrective Action — Cutting blades are bent or — Install new cutting blade unbalanced — Loose blower pulley or pulley Abnormal Vibration — Tighten the pulley assembly — Contact dealer to replace —...
  • Page 34 P P P P P P PECO PECO PECO PECO PECO New PECO, Inc. 10 Walden Dr | Arden, North Carolina 28704 Phone: 1-800-438-5823 | 828-684-1234 Fax: 828-684-0858 Email: peco@lawnvac.com Website: www.lawnvac.com...

This manual is also suitable for:

0674240906742410

Table of Contents