Engine/Blower/Blade Installation - Peco 06742408 Operator's Manual

John deere 1570 terrain cut 2015-newer 60” & 72” decks
Table of Contents

Advertisement

Engine/Blower/Blade Assembly Installation
Before mounting the Engine/Blower/Blade Assembly (Item #1) onto the Engine Mount Assembly (Item #2), place (2)
Rubber Shock Absorbers (Item #3) between the Mount Plate and Base of the Engine. Align the bolt holes of the
rubber pads with the bolt holes of the Engine Mount Plate. See Figure A & Figure B.
Place the Engine/Blower/Blade Assembly (Item #1) onto the Engine Mount Assy (Item #2) and align there bolt holes.
With the Rubber Shock Absorbers between the Engine and Mount Plate, fasten the Engine using (4) 5/16"-18 x 2-1/4"
HHCS (Item #4) and (4) 5/16"-18 Ny-Flange Locknuts (Item #5). See Figure A below.
Figure A
Figure B
Align bolt holes of
the Rubber Shock
Absorbers to the
Engine Mnt Plate
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

0674240906742410

Table of Contents