Box Handle Assembly & Installation - Peco 06742408 Operator's Manual

John deere 1570 terrain cut 2015-newer 60” & 72” decks
Table of Contents

Advertisement

Box Handle Assembly & Installation
The Box Handle is made up of two components, the Base Handle (Item #1) and Handle Extension (Item #2), secured
together by a Shaft Coupling (Item #3). See Figure A.
To install the Handle Extension onto the Base Handle, first, secure the Shaft Coupling onto the Base Handle. The
Shaft Coupling has (2) sets of set screws, position the Shaft Coupling so that (1) set screw will tighten onto the Base
Handle and secure the set screw, refer to Figure B. Next, insert the Handle Extension from the opposite end of the
Shaft Coupling and securing the Handle Extension by setting and tightening the second set screw. Refer to Figure B.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
Figure B
Note: Secure the set screw over the Handle Extension relatively loose
then adjust & position the handle to your preference before tightening
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

0674240906742410

Table of Contents