Length Of Hose Adjustment; Upper Hose Installation; Lower Hose To Blower Cone Installation; Lower Hose To Boot Installation - Peco 06742408 Operator's Manual

John deere 1570 terrain cut 2015-newer 60” & 72” decks
Table of Contents

Advertisement

Length Of Hose Adjustment

The hoses in the following steps must be cut to fit your
machine. Do not cut the hoses until you have tried to fit
them on your machine. Remember that the hoses need
to be long enough to allow for the opening and closing of
the collection system as well as allowing ample clamping
surface between each component.

Upper Hose Installation

Slide a Hose Clamp P#(J0070) over both ends of the 7"
Upper Hose. Secure one end of the Upper Hose to the
Inlet and Blower Outlet. Fasten the Hose by tightening
the Hose Clamps.
Inlet
20
Hose
Clamps
Blower
Cone
Lower Hose To Blower Cone
Installation
Slide a Hose Clamp, P#(J0090) over both ends of the 9",
Lower Hose. Secure one end of the Lower Hose to the
Blower Cone. Fasten the Hose by tightening the Hose
Clamp.

Lower Hose To Boot Installation

Take the unattached end of the Lower Hose and secure
it to the circular end of the Boot and fasten by tightening
the Hose Clamp.
Tip: Before securing Hose Clamp fully, rotate Lower
Hose counter-clockwise (away from yourself)
approximately 1" to aid in retaining Boot to mower deck.
Upper
Hose
Blower
Outlet
Lower
Hose
Hose
Clamps
Boot

Advertisement

Table of Contents
loading

This manual is also suitable for:

0674240906742410

Table of Contents