OmniCell ERB Installation And Service Manual page 95

Table of Contents

Advertisement

4. Unscrew the
Figure 3-15. Unscrewing the hex nuts
5. Remove the defective lock(s).
Figure 3-16. Removing the cam locks
6. Insert the new cam locks into the double D punch (holes) on the sheet metal.
Figure 3-17. Holes for cam lock
7. Secure the cam locks with the hex nut.
8. Check the flange positions.
Figure 3-18. Flange stop positions
9. Install the pawls. Secure them with the M5 nylock nuts.
© 2011 Omnicell, Inc.
hex nuts
with a wrench.
External Return Bin Installation and Service Guide/67-2038 Rev D
Service 3-7
Cam Locks

Advertisement

Table of Contents
loading

Related Products for OmniCell ERB

Table of Contents