OmniCell ERB Installation And Service Manual page 52

Table of Contents

Advertisement

2-42 Installation Instructions
Installation on G3 Cabinets with G4 Console Upgrade
2. Remove the plate on the back monitor side.
a. On the left side of the E-box, inside the cabinet, remove the screw that attaches the plate to
the frame
b. Press the plate to the inside to remove it.
3. Feed the ERB PowerCom cable in through the resulting hole.
4. Connect the ERB adapter cable to the E-box.
Figure 2-110. E-box connection point for ERB on AWS G3 with G4 console upgrade
External Return Bin Installation and Service Guide/67-2038 Rev D
© 2011 Omnicell, Inc.

Advertisement

Table of Contents
loading

Related Products for OmniCell ERB

Table of Contents