2-30 Installation Instructions
Installation on G3 Cabinets
10. Remove the black
Figure 2-79. Removing the plug cover
11. Thread the PowerCom cable through the rear cutout on the opposite side of the ERB. T he
correct orientation of the cable assembly exiting from the left side of the ERB is shown in the
figure below.
Figure 2-80. PowerCom cable routing
12. Cover the gray PowerCom cable with the black grommet taken off in
grommet together and push through the double D cutout on the left side.
Figure 2-81. Securing the grommet around the PowerCom cable
External Return Bin Installation and Service Guide/67-2038 Rev D
plug cover
by pushing against the groove from the inside with a screwdriver.
step
9. Squeeze the