OmniCell ERB Installation And Service Manual page 42

Table of Contents

Advertisement

2-32 Installation Instructions
Installation on G3 Cabinets
16. Fasten the ERB with four
Figure 2-85. Securing the ERB
17. Rotate the lower plates. The open side of the left lower plate should face left. The open side of
the right lower plate should face down. This allows the left cover plate to protect the cables
being routed out of the ERB. The right cover plates will seal the cable openings on the right
side of the ERB.
Figure 2-86. Orientation for left cover plates
Note:
The 6-pin white connector is not used.
Figure 2-87. Left I/O cover plate
18. Re-install the I/O cover plates, being careful not to pinch any wires:
a. Place the I/O cover plates in position.
b. Secure the cover plates by screwing in the two 4-40 flat head fasteners.
19. Close and lock the access door.
External Return Bin Installation and Service Guide/67-2038 Rev D
#8 hex nuts
to the metal studs on the AWS mounting bracket.
6-pin
connector
© 2011 Omnicell, Inc.

Advertisement

Table of Contents
loading

Related Products for OmniCell ERB

Table of Contents