Anesthesia Workstation (Aws) G3; Attaching The Erb To The Aws G3 - OmniCell ERB Installation And Service Manual

Table of Contents

Advertisement

2-26 Installation Instructions
Installation on G3 Cabinets

Anesthesia Workstation (AWS) G3

Attaching the ERB to the AWS G3

The ERB is attached to the left side of the AWS G3. Steps
cabling for installation on the left side.
1. Place the
buttonhead
Figure 2-67. Placing the AWS bracket on the left side of the AWS G3
2. Open the ERB access door with both keys. Use
#2202 to override the solenoid. The I/O cover plates can be seen.
Figure 2-68. I/O cover plate locations
3. Lay the ERB down as shown in
under the ERB.
Figure 2-69. Unscrewing the fasteners
External Return Bin Installation and Service Guide/67-2038 Rev D
AWS bracket
on the left side of the AWS and fasten to the side with four
screws.
Figure
2
through
key
#2204 to unlock the access door and
2-69, and unscrew the two
16
describe reconfiguring the
#8-32 x 3/16
key
4-40 flat head fasteners
from
© 2011 Omnicell, Inc.

Advertisement

Table of Contents
loading

Table of Contents