Prior To Installation; Storage; Unpacking; Tools Needed - Neptune TRU/FLO Installation And Maintenance Manual

Compound meter
Table of Contents

Advertisement

4 Installing the TRU/FLO

Prior to Installation

Storage

Unpacking

Tools Needed

8
This chapter describes storage, unpacking, and installation instructions for the TRU/FLO
meter.
Upon receipt, inspect shipping containers for damage and inspect the contents of any
damaged cartons prior to storage.
Once the inspection is complete, store the cartons in a clean, dry environment.
The TRU/FLO meter is heavy and needs to be handled carefully. Lift the assembly out of the box
by the meter maincase, and not by the register. Inspect the meter for damage but use caution;
the meter is very heavy.
After unpacking the TRU/FLO meter, inspect it for damage. If the meter appears to be
damaged, notify your Neptune Territory Manager or Distributor. If one or more items
requires reshipment, use the original cardboard box and packing material.
Table 7 on page 7 shows the recommended tools you need to successfully install the
TRU/FLO meter.
Table 7 is not a complete list of tools.
TRU/FLO Compound Meter Installation and Maintenance Guide

Advertisement

Table of Contents
loading

Table of Contents