Neptune TRU/FLO Installation And Maintenance Manual page 51

Compound meter
Table of Contents

Advertisement

Figure 57 O-ring
Figure 58 Reinstalling the Parts
Figure 59 Secure Retainer Ring
TRU/FLO Compound Meter Installation and Maintenance Guide
3
Make sure the o-ring inside the main valve assembly is in good
condition and does not have any nicks or cuts. See Figure 57.
If the o-ring is damaged, a failed low flow test could result.
4
Replace the o-ring if needed.
5
After checking the retainer ring, the o-ring, and the integrity of the
main valve, the parts can be reinstalled. See Figure 58.
6
Reinstall the retainer ring on the main valve and tighten the four
screws. See Figure 59.
Appendix C
39

Advertisement

Table of Contents
loading

Table of Contents