Chapter 4: Installing The E-Coder ® )R450I; Prior To Installation; Inspecting The Unit; Unpacking - Neptune E-CODER) R450i Installation And Maintenance Manual

Table of Contents

Advertisement

This chapter provides instructions for:
Storing and unpacking the E-CODER
l
Performing preliminary tests.
l
Verifying materials.
l
Selecting a site.
l
Installing the unit.
l

Prior to Installation

This section defines how to unpack and store the E-CODER)R450i prior to installing it.

Inspecting the Unit

After receipt, inspect all shipping containers for damage, and inspect the contents of any
damaged cartons prior to storing.
After completing the inspection, store the cartons in a clean, dry environment. The unit
remains in sleep mode until it is exposed to light.

Unpacking

As with all precision electronic instruments, handle the E-CODER)R450i carefully; however,
no additional special handling is required. When shipped, the assembly is lying on its side.
You should lift the assembly out of the box by the meter main case.
After unpacking the E-CODER)R450i, inspect it for damage. If the E-CODER)R450i appears to
be damaged or proves to be defective upon installation, notify your Neptune Territory
Manager or Distributor. If one or more items require reshipment, use the original cardboard
box and packing material.

Tools Needed

"Tools and Materials" on page 5 shows the recommended tools you need to successfully
install the E-CODER)R450i.
Some items may not apply to your specific installation, or the list may not contain all
required tools or materials.
E-CODER ®
)R450
i ™ Installation and Maintenance Guide
Chapter 4: Installing the E-CODER
®
)R450i™.
®
)R450i™
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-CODER) R450i and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents