Installation Procedures - Mitsubishi RH-3SQHR3515 Instruction Manual

Table of Contents

Advertisement

2.2.3 Installation procedures

The installation procedure of the robot arm is shown below.
(Installation
reference)
Maintenance space
Fig.2-3 : Installation dimensions
1) The robot installation surface has been machine finished. Use the installation holes (4-φ9) opened at the
four corners of the base, and securely fix the robot with the enclosed installation bolts (hexagon socket
bolts).
2) Install the robot on a level surface.
3) It is recommended that the surface roughness of the table onto which the robot is to be installed by Rz25 or
more. If the installation surface is rough, the contact with the table will be poor, and positional deviation
could occur when the robot moves.
4) When installing, use a common table to prevent the position of the devices and jigs subject to robot work
from deviating.
5) The installation surface must have sufficient strength to withstand the arm reaction during operation, and
resistance against deformation and vibration caused by the static (dynamic) load of the robot arm and
peripheral devices, etc.
F
F
H
F
H
F
*1)
V
M
T
M
L
F
H
M
L
F
H
V
Maintenance space
4-M8 hole for the jack-
up
Installation stage
据付架台(例)
(example)
2Unpacking to Installation
4-φ9 installation hole
2-M12 hole for hanging
tools
*1) The interference of installation
bolt and No.1 arm may occur
depending on the size of
installation stage. Take care
against interference of
installation bolt, such as
inserting the installation bolt
from the bottom.
Installation
2-9

Advertisement

Table of Contents
loading

Table of Contents