Figure 14-3 Operation panel lever
Remove the operation panel while being careful not to damage any cables.
3.
Note - Place the removed operation panel on a grounded antistatic ESD mat.
14.4
Installing the Operation Panel
This section describes the procedure for installing the operation panel.
178
Fujitsu M10-1/SPARC M10-1 Service Manual ・ June 2021
A