Platform - Zepro Z 10 Installation Instructions Manual

Tail lift
Hide thumbs Also See for Z 10:
Table of Contents

Advertisement

Installation
6.11

Platform

1. Check that all included components are clean,
cleaning them where necessary.
2. Lubricate the bushings on the upper arm
bearing, see Image 42. Use Zepro lubricant or
the equivalent.
NOTE.
Maximum load capability of aluminium platforms
is at 600 mm as standard. On Z 10 and Z15,
the marking can be moved to 750 mm (see "9.1
Loading diagram" on page 42).
3. Fitting the platform to the arms. Tighten the nuts
using a torque wrench, see Image 43.
Tightening torque: 280 Nm.
4. Fit one of the tilting cylinders to the platform. Use
the provided shaft and support wheel see Image
43.
NOTE.
Make sure the cylinders are installed with the
grease nipples facing up.
Tighten the bolts using a torque wrench.
Tightening torque 280 Nm.
www.zepro.com
Note. Lubricate the bushings
Image 42. Make sure the ini-
tially lubricate the bushings
Image 43. Installing platform and tilting cylinder
Z 10/15/20
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z 15Z 20

Table of Contents