Main Power Cable - Zepro Z 10 Installation Instructions Manual

Tail lift
Hide thumbs Also See for Z 10:
Table of Contents

Advertisement

Installation
6.5

Main power cable

6.5.1
Cable routing
1. Route the main power cable from the lift to the battery.
ensure it is not clamped to the brake line or the vehicle's existing electrical system.
NOTE!
The cable must not be clamped to brake lines or the normal on-board electrical system.
The cable must be protected by rubber grommets when it passes through beams or walls, see Image 26.
The cable must be installed sufficiently far from, or be protected against, sharp edges so that it cannot
chafe or otherwise sustain damage that can lead to a short circuit and cable fires.
Do not bend the cable with too small a radius as this can cause damage to the cable.
In general, care must be taken when routing all the cables in order to obtain a longer cable service life
and to reduce the risk of unnecessary stoppages.
NOTE.
The fuse box must be located in a well protected position as close to the battery as possible.
2. Check that the hydraulic unit is effectively earthed. Certain commercial vehicle manufacturers provide
special earth connection points.
3. Connect the main power cable to the hydraulic unit, see "9 Electrical and hydraulic diagrams" on page 43.
www.zepro.com
Image 26. Protect the cable against sharp
edges and use cable grommets
Route the cable through a plastic casing and
Z 10/15/20
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z 15Z 20

Table of Contents