Download Print this page

OLT SM812-FJ-Cedar Assembly Manual page 39

8x12 spacemaker shed fj bevel model with cedar roof

Advertisement

70.
Position Left Side Door as per Step 69 and secure with 2" Black Screws. When satisfied with
door positioning, complete all 2" Black Screw attachments. Note: Do not over tighten hinge screws
when using screw gun. Tighten 3/4 of the way and use a Screw Driver to finish so as not to strip
screws.
72.
Close both doors and align so doors
are straight. Attach Door Threshold with
4 - 2" Screws, centering between doorway.
Parts
Door Threshold
(3/4" x 2 1/2" x 62 1/2") x 1
Hardware
S3 - 2" Screws x 4 total
Toll Free 1-888-658-1658
71.
Attach Horizontal and Vertical Door Stops to Door
Header and Jambs. Start with Horizontal Stop first and
then complete both Vertical Stops. Position so door gap is
covered. Use 4 - 2" Screws per piece to secure.
Horizontal Door Stop
(1/2" x 2 1/2" x 68") x 1
Vertical Door Stops
(1/2" x 2 1/2" x 72") x 2
www.outdoorlivingtoday.com
Page 39
Parts
sales@outdoorlivingtoday.com
Hardware
S3 - 2" Screws
x 12 total

Advertisement

loading