Download Print this page

OLT SM812-FJ-Cedar Assembly Manual page 26

8x12 spacemaker shed fj bevel model with cedar roof

Advertisement

Shingles overhang plywood
on Outside Roof Panel.
44.
Lift up, position and attach 2nd Outside Roof Panel on Rafters as per Step 42.
Middle Panel
Outside Panel
45.
Position and attach Roof Panels on the other side as per Steps 41 - 44.
47.
Screw first filler shingle down to rafters
using 1 - 2 1/2" Screw per panel (2 in total).
Make sure to screw into both rafters.
Toll Free 1-888-658-1658
Outside Panel
46.
Roof Filler Shingles are included to cover roof seams.
Starting at the bottom, slide the first Long Shingle in until flush
with other bottom shingles.
Parts (Steps 46 - 48)
Filler Shingles - Long x 16
Filler Shingles - Short x 4
www.outdoorlivingtoday.com
Page 26
Hardware (Steps 46 - 48)
S1 - 2 1/2" Screws x 32 total
N2 - 1 1/2" Shingle Nails x 8 total
Attach above
the exposure
line.
Exposure
Line
sales@outdoorlivingtoday.com

Advertisement

loading