Download Print this page

OLT SM812-FJ-Cedar Assembly Manual page 21

8x12 spacemaker shed fj bevel model with cedar roof

Advertisement

29.
Locate 9 Rafters, 2 Soffits and a completed Ridge
Board. Lay out on level ground as shown to the right. Double
up Rafters as illustrated. Screw doubled up Rafters together
with 3 - 2 1/2" Screws per piece.
Parts (Steps 29 - 31)
Rafters
(1 1/2" x 3 1/2" x 56 1/2") x 18
Soffits
(1/2" x 4 1/2" x 68 1/4") x 4
45 1/2"
Important: Pilot
Hole
Soffit
prevent splitting!
Toll Free 1-888-658-1658
Hardware (Steps 29 - 31)
S1 - 2 1/2" Screws x 12 total
S2 - 1 1/4" Screws x 28 total
S3 - 2" Screws x 28 total
Ridge Board
Important:
Pilot
Hole Ridge Board
to prevent splitting!
Connector
Plate to inside
68 1/4"
31.
to
Attach end of a Soffit flush to ends of outside rafters with
2 - 1 1/4" Screws per Rafter end. Drill pilot holes in Soffit to
prevent splitting. Complete both outside Rafter / Soffit connec-
tions first. Measure and position interior Rafters as illustrated
above. When positioned correctly, attach Soffit to remaining
Rafters with 2 - 1 1/4" Screws per Rafter.
Flip completed rafter section over. Complete 2nd Rafter section
now as per the 1st, but with the following exception - When
attaching Ridge Board to Rafter ends, make sure Metal
Ridge Board Connector is positioned so offset to first
Rafter Section. See Step 36 for illustration.
www.outdoorlivingtoday.com
30.
Attach completed Ridge Board to ends of both
outside Rafters with 2 - 2" Screws per end. Measure
and position interior Rafters as illustrated below. When
positioned correctly, attach Ridge Board to remaining
Rafters with 2 - 2" Screws / Rafter end.
136 1/2"
20 1/2"
45 1/2"
Page 21
Doubled up Rafters
- screw together with
3 - 2 1/2" Screws.
20 1/2"
45 1/2"
sales@outdoorlivingtoday.com
Soffits

Advertisement

loading