Download Print this page

OLT SM812-FJ-Cedar Assembly Manual page 10

8x12 spacemaker shed fj bevel model with cedar roof

Advertisement

11.
Position all Large & Small Plywood Floor pieces on
top of completed floor joists. The Plywood is cut slightly
smaller than Floor framing. Keep Plywood seams tight.
Parts (Steps 11 - 12)
Plywood Floor - Large
(45 3/8" x 74 7/8") x 3
Plywood Floor - Small
(45 3/8" x 20 7/8") x 3
Completed Floor
configuration
Toll Free 1-888-658-1658
Important - Make sure floor is
level before moving on to wall
section. Use a level to confirm,
and shim floor joists as required.
Hardware (Steps 11 - 12)
S2 - 1 1/4" Screws
x 70 total (approx.)
12.
With Plywood positioned correctly on
floor framing, attach with 1 1/4" Screws.
Use screws every 16".
www.outdoorlivingtoday.com
Page 10
push plywood
together at seams.
Hint: Use a chalk line
to mark location of floor
joists
to
determine
screw placement.
sales@outdoorlivingtoday.com

Advertisement

loading