Exploded view of upside down roof panels.
Shingles overhang plywood
on outside panels.
41.
Identify all Roof Panels. There are 4 Outside
and 2 Middle Roof Panels. Outside Panels will have
shingles overhanging the plywood on one side. Lift up
and place an Outside Roof Panel on Rear Rafters.
Roof Plywood recessed
1/8" from Rafter end.
42.
Place Outside Roof Panel so it sits flush on 3rd Rafter from the outside (doubled up Rafter).
Plywood on roof should be recessed 1/8" from end of Rafter at bottom, and flush with seam of
doubled up Rafters. From the outside, screw down through bottom row of shingles into Rafter with
1 - 2 1/2" Screw. Angle 1 - 2 1/2" Screw from outside Rafter into roof plywood.
43.
Locate a Middle Roof Panel (roof plywood flush with outside of shingles), and place on middle
Rafters. Align panel as per Step 42 and screw panel down to Rafters with 2 - 2 1/2" Screws in the
bottom row of shingles.
Toll Free 1-888-658-1658
Shingles and plywood
flush on middle panel.
Angle Screw from
Rafter into Plywood
with 2 1/2" Screw.
www.outdoorlivingtoday.com
Parts (Steps 41 - 45)
Outside Roof Panels
(51" wide) x 4
Middle Roof Panels
(45 1/2" wide) x 2
2 1/2" Screw in Bottom
Row of Shingles.
Page 25
Outside Roof Panel.
Hardware (Steps 41 - 45)
S1 - 2 1/2" Screws
x 12 total
sales@outdoorlivingtoday.com