Drip Cap rests in notch
of Door Header.
57.
Position Drip Caps so they are
overlapping above doorway, resting in
the notch of the Door Header. Attach
each Drip Cap with
5 - 1 1/2" Finishing Nails per piece.
With Drip Caps secured place Front
Horizontal Gable Trims over the
Drip Caps and attach each with
2 - 1 1/2" Finishing Nails.
Parts
Metal Drip Caps
x 2
Front Horizontal Gable Trim
(1/2" x 4 1/2" x 43 1/4") x 2
Hardware
N1 - 1 1/2" Finishing Nails
x 14 total
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 32
sales@outdoorlivingtoday.com