Operation; Training The Operating Staff; Safety Instructions - WAGNER Cobra 40-10/2K Translation Of The Original Operating Manual

High pressure double diaphragm pump for 2 component products with mixing ratio 1:1
Hide thumbs Also See for Cobra 40-10/2K:
Table of Contents

Advertisement

VERSION 07/2014
OPERATING MANUAL
7

OPERATION

7.1

TRAINING THE OPERATING STAFF

Incorrect operation!
Risk of injury and damage to the device.
7.2

SAFETY INSTRUCTIONS

Observe safety instructions in Chapter 4.
Incorrect operation!
Risk of injury and damage to the device.
Unintentional putting into operation!
Risk of injury
Before any work on the device, in the event of work interruptions
and malfunctions:
ORDER NUMBER DOC2349980
WARNING
The operating staff must be qualifi ed and fi t to operate the
entire system.
The operating staff must be familiar with the potential risks
associated with improper behavior as well as the necessary
protective devices and measures.
Before work commences, the operating staff must receive
appropriate system training.
WARNING
If contact with solvent-based paints or cleaning agents causes
skin irritation, appropriate precautionary measures must be
taken, e.g. wearing protective clothing.
The footwear worn by operating staff must comply with
EN ISO 20344. The measured insulation resistance must not
exceed 100 megohms.
The protective clothing, including gloves, must comply with
EN  ISO 1149-5. The measured insulation resistance must not
exceed 100 megohms.
WARNING
Switch off the energy/compressed air supply.
Relieve the pressure from the spray gun and unit.
Secure the spray gun against actuation.
In the event of functional faults: remedy the fault as described in
the "Troubleshooting" chapter.
35

Advertisement

Table of Contents
loading

Table of Contents