Completing The Installation; Completing The Installation Of A New System - Enterasys Matrix 7H4284-49 Hardware Installation Manual

Dfe-platinum series
Hide thumbs Also See for Matrix 7H4284-49:
Table of Contents

Advertisement

Modem Port Adapter Wiring and Signal Diagram
RJ45
Pin
1
2
4
5
6
8
3.8

COMPLETING THE INSTALLATION

Completing the DFE module installation depends on if the module is being installed in:
a new DFE module system (refer to
an established, operating DFE module system (refer to
3.8.1

Completing the Installation of a New System

In a new system of DFE modules, one of the installed DFE modules will become the management
module on chassis power up, and all DFE modules will automatically be set to the factory default
values. A complete list of the factory default values are provided in Chapter 3 of the Enterasys
Matrix DFE-Platinum Series Configuration Guide.
After installing all DFE modules into the host chassis and making the connections to the network,
proceed to the following
access the module management startup screen from your PC, terminal, or modem connection.
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Section
"First-Time Log-In Using a Console Port
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator
3.8.1), or
Section
3.8.2).
Connection" procedure to
Completing the Installation
Installation
3-19

Advertisement

Table of Contents
loading

Table of Contents