Installing The Power Supplies; Threading The Cables - Enterasys D2G124-12 Hardware Installation Manual

D-series
Hide thumbs Also See for D2G124-12:
Table of Contents

Advertisement

Figure 2-16

Installing the Power Supplies

3.
Seat the lower power supply against the bottom of the lockbox with its DC power cord facing 
left as shown in Figure
supply. 
4.
Attach the three‐prong end of the connecting cord to the Power1‐B power input on your D2 
switch.
5.
Thread the DC power cords from both power supplies and the connecting cord in between the 
D2 switch and the upper power supply and secure them in place with the hook & loop strap, 
as shown in Figure
Figure 2-17

Threading the Cables

2‐16. Fasten the two hook & loop straps securely around the power 
2‐17.
Enterasys D-Series Hardware Installation Guide 2-19
Mounting the Switch