Installing The Switch Under A Table; Installing The Switch In The Table Mount Kit (Shown With One D2-Pwr Supply) - Enterasys D2G124-12 Hardware Installation Manual

D-series
Hide thumbs Also See for D2G124-12:
Table of Contents

Advertisement

Mounting the Switch

Installing the Switch Under a Table

To install the switch in the table mount kit and then install it under a table, refer to Figure
proceed as follows:
Figure 2-9
1
Table mounting screw holes (four)
2
Switch mounting screw holes (three)
3
AC power receptacle
4
Power supply hook & loop strap
5
DC power cord
1.
Ensure that you have appropriate screws for securing the assembled table mount kit to your 
table location. These four screws are required and are not provided in the table mount kit.
2-10 Installation
Caution: The table location and rack mounting screws/anchoring method that the installer selects
for mounting the D2 switch must be capable of supporting 60 lbs (27.2kg).
Advertencia: La ubicación de la mesa y el método de anclaje o los tornillos de montaje del estante
que el instalador seleccione para montar el interruptor D2 deberán ser capaces de soportar un peso
de 60 lbs (27.2 kg).

Installing the Switch in the Table Mount Kit (shown with one D2-PWR supply)

6
Serial number access window
7
Power supply (D2-PWR shown)
8
AC power cord
9
Hook & loop strap through power supply mounting
holes
10 Hook & loop strap through bridge anchor
2‐9 and 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2g124-12p

Table of Contents