Chapter 3: Installing A Power Supply; Unpacking A K-Series Ac Power Supply - Enterasys K-Series Installation Manual

Table of Contents

Advertisement

This chapter provides instructions for installing and connecting power to the K-Series AC power
supplies.
For more information about:

Unpacking a K-Series AC Power Supply

Connecting the K-POE-4BAY PoE Shelf to a K-Series Chassis
Installing a K-Series AC Power Supply in the K-POE-4BAY PoE Shelf
Connecting a K-Series AC Power Supply to AC Power
Unpacking a K-Series AC Power Supply
The K-Series AC power supply is shipped separately from other K-Series hardware. To unpack a
power supply:
1.
Unpack the power supply by removing it from the shipping box and sliding the two foam end
caps off the unit.
Save the shipping box and materials in the event the unit must be reshipped.
2.
Verify the contents of the box using
3.
Remove the power supply from its protective plastic bag.
4.
Examine the power supply carefully, checking for damage.
If there are any signs of damage, DO NOT install the power supply; instead, contact Enterasys
Networks. Refer to
Electrical Hazard: Only qualified personnel should perform installation procedures.
Riesgo Electrico: Solamente personal calificado debe realizar procedimientos de instalacion.
Elektrischer Gefahrenhinweis: Installationen sollten nur durch ausgebildetes und qualifiziertes
Personal vorgenommen werden.
"Getting
Installing a Power Supply
Table 3-1
as appropriate.
Help" on page xiv for details.
Enterasys K-Series K-POE-4BAY PoE Shelf Hardware Installation Guide 3-1
3
Refer to page...
3-1
3-2
3-3
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-poe-4bay

Table of Contents