Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at back side.
3
Stagger each row.
Notch
Flush with rain slots.
4
Continue installing rows of
shingles by staggering at front.
Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a
5
maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a
utility knife.
(12,7 cm)
Cut Off.
• If more than 5" to rain slot you must install another row of shingles.
6
Using your shingle hooked blade carefully cut shingles along chalk line.
1"
(2,5 cm)
Notch
5"
Top of rain slot.
SHINGLES
continued...
Cut
5"
(12,7 cm)
or less.
66
DOOR
BACK OF SHED
Flush with rain slots.
BACK OF SHED