Download Print this page

Heartland VALUE Series Assembly Manual page 67

Hide thumbs Also See for VALUE Series:

Advertisement

• Follow directions provided by manufacturer and these instructions.
Familiarize yourself with a 3-Tab Shingle.
Half A Rain Slot
¸
BEGIN
Install first starter row upside down, color up and flush to drip edge at bottom of roof panel. Use (4) nails per shingle.
1
Starter row must be straight and level all the way across with lower edge of roof deck.
Shingle overlaps
roof decking.
2
2
Begin where indicated on image below, install first row of shingles with notch flush with drip edge.
Drip Edge
Notch
SHINGLES
- NOT INCLUDED -
Notch
SHINGLE NAIL PATTERN
1"
(1,3 cm)
(2,5 cm)
Full Rain Slot
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
(4) Nails
Flush to drip edge.
1" (2,5 cm)
BEGIN
Flush to drip edge.
1/2"
Sealing Strip
NAILS
TABS UP
Flush with starter row.
65
Notch
1"
(2,5 cm)
DOOR
START HERE
BACK OF SHED
DOOR
BACK OF SHED

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Soho modern