Download Print this page

Back Wall Installation - Heartland VALUE Series Assembly Manual

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x1
GKA
TEMPORARY
2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm)
BEGIN
1
Center back wall assembly on the 144" fl oor dimension.
Note: The 4" wall overhang is installed to the top.
2
Use GKA as a temporary brace.
Secure GKA with (2) 3" screws (Fig. A).
First, nail lower edge of panel to fl oor frame with 2" nails spaced 6" apart.
3
Angle nail to hit fl oor frame (Fig. B).
4
Secure back wall bottom plate to fl oor with 3" nails (Fig. B).
3" Nails into bottom plate.
FINISH
Your back wall is now standing.

BACK WALL INSTALLATION

24
x2
3" (7,6 cm)
x12
x27
2" (5,1 cm)
4"
(10,2 cm)
Fig. A
3" (7,6 cm)
Fig. B
3" (7,6 cm)
GKA
3" (7,6 cm)
Screws x2
Nail 2" nails fi rst.
Nails
2" (5,1 cm)
Nails

Advertisement

loading

This manual is also suitable for:

Soho modern